This caused of Endang Welding Workshop implement a scheduling system First Come First Serve (FCFS) in scheduling sequences 1-2-3-4-5-6-7-8-9-10-11-12-13-14-15-16-17-18. The problem is often a delay of delivery of orders caused by the length of the total order completion time (makespan) with the percentage reached 60% of total orders in December of 2015. Other thesis, Universitas Katolik Musi Charitas Palembang.Įndang Welding Workshop was one of the welding shop that receives goods from iron-making services, such as trellis, iron fence, iron or clothesline pole, and so on. Usulan Penjadwalan Job Shop Untuk Meminimasi Makespan Menggunakan Algoritma Genetika(Studi Kasus Di Bengkel Las Endang Palembang).